ACC 561 Week 3 Quiz
Multiple Choice Question 37
A major purpose of cost accounting is to
Multiple Choice Question 38
The two basic types of cost accounting systems are
Multiple Choice Question 39
A process cost system would most likely be used by a company that makes
|
|
| ||
| Multiple Choice Question 40 Which of the following would be accounted for using a job order cost system?
| |
Multiple Choice Question 45
The flow of costs in a job order cost system
Multiple Choice Question 60 The entry to record the acquisition of raw materials on account is
|
|
| Multiple Choice Question 73 Time tickets should be approved by
|
|
| Multiple Choice Question 89 The labor costs that have been identified as indirect labor should be charged to
| ||||||||
Multiple Choice Question 90
Manufacturing overhead is applied to each job
| at the end of the year when actual costs are known. |
| only if the overhead costs can be directly traced to that job. |
| by means of a predetermined overhead rate. |
| at the time when the overhead cost is incurred. |
Multiple Choice Question 38
A process cost accounting system is most appropriate when
| a variety of different products are produced, each one requiring different types of materials, labor, and overhead. |
| similar products are mass-produced. |
| the focus of attention is on a particular job or order. |
| individual products are custom made to the specification of customers. |
| Multiple Choice Question 43 Which of these best reflects a distinguishing factor between a job order cost system and a process cost system?
|
Multiple Choice Question 47
In process cost accounting, manufacturing costs are summarized on a
| production cost report. |
| manufacturing cost sheet. |
| process order cost sheet. |
| job order cost sheet. |
Multiple Choice Question 49
In a process cost system, product costs are summarized:
| on job cost sheets. |
| on production cost reports. |
| after each unit is produced. |
| when the products are sold |
Multiple Choice Question 136 Which of the following is considered a difference between a job order cost and a process cost system?
|
|
Multiple Choice Question 35
The costs that are easiest to trace directly to products are
| A.direct materials and direct labor. |
| B.direct labor and overhead. |
| C.direct materials and overhead. |
| D.None of the above; all three costs are equally easy to trace to the product. |
Multiple Choice Question 36
Often the most difficult part of computing accurate unit costs is determining the proper amount of _________ to assign to each product, service, or job.
| direct materials |
| overhead |
| direct labor |
| direct materials and direct labor |
Multiple Choice Question 49
The last step in activity-based costing is to
| assign manufacturing overhead costs for each activity cost pool to products. |
| compute the activity-based overhead rate per cost driver. |
| identify and classify the major activities involved in the manufacture of specific products. |
| identify the cost driver that has a strong correlation to the activity cost pool. |
Multiple Choice Question 50
The first step in activity-based costing is to
Multiple Choice Question 51
A well-designed activity-based costing system starts with
| Multiple Choice Question 53 An example of an activity cost pool is |
13 years ago
Purchase the answer to view it
- week_3_practice_quiz.docx